Douglas Canopy Lounge

The decking and the complete roofing were delivered quickly within 8 weeks. All parts of the roofing were numbered and a manual and construction drawing were included. With a few men we assembled all beams in an afternoon. The epdm roofing was already on at the end of the afternoon. On the second day we installed the fascias and laid the hardwood decking. The second evening we used the roofing for a barbecue with friends. I would definitely recommend this company. We already had some job experience.

Tags for this product: Decking Timber frame

Calculating tool

Our products in this project

Roof Berend

Timber framing, Berend flat roof, with overhang

3.30 x 6.00 m1
Construction drawing
Douglas fir or Oak
With mortise and tenon joint

Posts: 15x15 or 18x18 cm
Traditioneel: Mortise and tenon joint
Building plan: All timber is numbered
   
Assembly:  Quick and easy
Bent framing: Assembly without screws
   
Calculate: Each model
  Incl. walls and roof boards